Between a Rock and a Hard Place

Adhering Liner to Concrete
     As a professional pond builder, it turns out that most of the projects we complete at Rapid Water Gardens do not consist of digging and building new ponds. Rather, the vast majority of our work consists of fixing or re-building poorly constructed ponds and water features that were installed by others. Such was the case with a project we completed in Spring, Texas during the summer of 2023.

     A unique project located in a beautiful park right off Interstate 45 that is maintained and operated by the Harris County water district. Within the park are countless tall pines and lush oaks populated with many squirrels and varieties of birds, especially those birds that enjoy fishing for a tasty meal in one of the three large clay bottom ponds on the property.  Mallard ducks, European geese, blue heron and even two great bald eagles we watched feast on the watery prey. There are many miles of well-maintained gravel jogging tracks throughout the park that twist in and out of the trees and even cross over bridges that span waterways that connect the large ponds. The park, designed and built in the early 2000’s, is  used often by the surrounding subdivisions bringing many families to the playground, joggers to the tracks and even fishermen to the ponds. 

     The soil in the area is quite sandy and consists of little clay, meaning that holding water is virtually impossible without the implementation of some sort of liner. In this case, and given the size of the ponds, the original developers constructed each of the three ponds with a two-foot-thick clay liner, sufficient to maintain the desired water level in each pond. Between the first two ponds (we’ll call them Pond A and Pond B) there is a long spillway (approximately 120-feet in length) carved into the earth connecting the two bodies of water. Pond A sits approximately 30-feet higher in elevation relative to Pond B. Water is pumped from Pond B (the lower pond) up to Pond A and dispersed through a series of old and dilapidated waterfalls until the water level of Pond A is sufficient to overflow the spillway flowing back into Pond B completing the circulation cycle.

     While the ponds are constructed using a clay liner, the 120-foot long spillway connecting Pond A and Pond B is not; the developer instead used a thin layer of concrete (only a few inches thick) combined with hundreds of small to medium size moss boulders. As my father always says, “there are only two types of concrete; concrete that is cracked, and concrete that is going to crack”. After 17 years of use, that is exactly what we found; many visible cracks in the concrete causing water to leak into the sandy soil and be lost to ground water. Ultimately, they were draining their ponds each time they turned on the pumps and ran the waterfalls over the spillway. And still there was a bigger problem; the sandy soil under the cracked concrete was eroding and creating large cavities under the spillway. If the concrete ever gave way it might collapse into a car-size cave. In fact, we were told that was exactly what happened a few years before on one of their other waterfalls which has since been removed completely.

     Park management was ready for a long-term solution. Working with us it was agreed that a rubber liner system would be best. The project seemed rather simple; start by demolishing the existing 120-foot long spillway and disposing of the old concrete; clean the area and remove any remaining sharp objects such as broken rocks, concrete shards or rebar; lay down a thick layer of non-woven geotextile underlayment to protect the liner from being punctured; then install a 45mil EPDM liner to act as the new spillway/water membrane; and finally, dress it all back up with new (large) Texas moss boulders and river rock giving it a much more natural and appealing look.

​     There was just one major challenge to work through; how to make a watertight seal at the top of the spillway where Pond A flows in. We were attempting to merge two very different types of liner systems. The ponds, as mentioned, being constructed using a two-feet layer of clay to hold water; and the spillway now being re-constructed using EPDM rubber liner. Without a watertight seal at the top of the spillway, water would simply make its way under the liner and become an even bigger problem than it was before. The success of the entire project rested on this connection point. We had already decided that lining the spillway with two feet of clay would eventually all be eroded away given the roughly 30-foot-high slope and the constant flow of rushing water over it. Perhaps, we thought, we could dig the edge of the liner into the clay at the bottom of the pond near the start of the spillway; then cover that edge with lots of new clay and add large boulders for retention and erosion prevention. After that we could continue working down the steam without need for further clay. Once the water flowed down into Pond B there was no need to make a second watertight seal given the slope.

​     That was the plan we went with… But if you know anything about construction then you have probably already guessed that it certainly did NOT work out that way. I learned very early in the construction industry that the best attribute must be flexibility. You’ve got to be able to roll with the punches or risk a knock-out before the end of the first round. Fortunately, in this case, I think our actual solution ended up being far better than our initial plan. Here’s what happened…

     Pond A had to be partially drained before we began any work; this would prevent water from leaking into the spillway once we had ripped out the old concrete. Even to partially drain the pond would take 4-5 days and while the park manager had been working there for many years, he had never seen the pond drained before. So, none of us had any idea as to what we would find under the water at the start of the spillway. What we did find caught us completely off-guard. The original developer had installed a concrete header at the start of the spillway, approximately 20-feet long, 30-feet wide (which was the width of the spillway), and at least 12-inches thick, significantly thinker than the other 100 feet of the spillway and is an integral structural part of the existing pond. Removing the concrete header would certainly cause a leak in the pond and likely way more problems than we had a mind to deal with.

     After some cursing and head-scratching we began looking into various types of gasket solutions and ultimately, we may have found the perfect product. A little-known construction genius (my father) recommended a product called Synko-Flex Waterstop (Disclaimer: neither myself or my father or anyone at Rapid Water Gardens has any affiliation to the producers of Synko-Flex nor do we receive any benefit for mentioning their product). According to their website, Synko-Flex is a “self-sealing, non-swelling preformed joint sealant [that] provides a lasting, watertight bond on both fresh and cured concrete surfaces”. This is a nasty but very effective product. Nasty in the sense that any clothing or tools that come in contact with it are ruined forever; you will not get it to wash off – but it is safe for use in potable water structures. It comes in 1-inch by 3-foot strips that must be about ½-inch thick.

     We then obtained some 1.5-inch-wide stainless-steel strips (stainless to prevent corrosion and rust), about ¼-inch thick and had them hole-punched (every foot) at a machine shop using a hydraulic press. Back at the concrete header we core-drilled anchor bolt holes matching the spacing of our punched stainless-steel strips and hammered in the anchor bolts. Then the Synko-Flex strips were forced down over the anchor bolts and adhered to the concrete slab (remember to put duck-tape around the bolt threads before applying the Synko-Flex, otherwise the threads will become un-usable and you will have no way to tighten them down). Next, our EPDM liner was placed over the anchor bolts and carefully punched to avoid tears. Lastly the stainless-steel strips were put down on top of the liner and Synko-Flex, and the nuts and washers were tightened down creating the perfect watertight seal. There were also 2-foot vertical concrete walls attached to the pond’s concrete header on either side. This too was no problem for the Synko-Flex; we simple made a 90 degree vertical turn and added another stainless-steel strip compressing the liner and the Synko-Flex to the concrete walls.

     Once we had our watertight connection at the top of Pond A, the remainder of the project ran smoothly. More than 100 tons of stone and gravel were strategically placed into the 120-foot long spillway, creating a beautiful winding stream with many cascading waterfalls. It’s also worth noting that we had to work backwards on this project. Normally when building waterfalls, you would start at the bottom and build up towards the top. However, given that the most crucial part of this project was the watertight seal at the top, we decided it was best to start there and work our way down instead. In the end, ourselves along with park management and many other regular park-goers whom we have spoken with, are ecstatic about the final product. Check out the before and after pictures here at Rapid Water Gardens. 
Project Gallery

    Set up a Consultation Today!

Submit
​Contact Rapid Water Gardens for a consultation today!
Houston Phone Number: (713) 369-0909
​Austin Phone Number: (737) 473-1888
Email: [email protected]
Picture
Picture
  • Home
  • Pricing
    • Pond Pricing
    • Fountain Pricing
    • Waterfall Pricing
  • Services
    • Austin Services
    • Houston Services
  • Gallery
  • Articles
  • About Us
  • Contact Us
    • Houston: 713-369-0909
    • Austin: 737-473-1888